3,4 MWp Cuenca I, España

  • 3,4 MWp
  • Location: Cuenca, España
  • Configuration of the modules: 2 módulos en horizontal
  • Inclination of the modules: 30º
  • Number of modules per structure: 80
  • Min. height of the module above ground: 400 mm.
  • Anchor: Zapata
  • End of execution: Mayo 2008